INFRASTRUCTURE

R & D

We at New Look Fashions emphasize on Research and sample development as our core business. As an Innovative and Sustainable organization, we have integrated R & D infrastructure and team to lead process and product development & Improvement.

The objective of the R & D;

  • Improve process and product by optimisation.
  • Enhancing the efficiency in sustainable way.
  • Reducing the utilisation of natural resource.
  • Innovate the sustainable product and process.

OUR SUSTAINABLE FABRICS

We do all types of cotton, cotton blends & sustainable fabrics as below.

  • BCI Cotton
  • 100% Organic Cotton
  • 100% Pima Cotton
  • Organic Cotton / Tencel (Lyocell)
  • Organic Cotton / Bamboo blend
  • Organic Cotton / Recycled polyster
  • Organic Cotton / Modal
  • Organic Cotton / Viscose
  • 100% Recycle Polyster
SPECIAL FABRIC FINISH
  • UV Protection /Anti–microbial
  • Moisture Observation / Bio & Silicon softness

FABRICS INSPECTION

  • 100% All fabric rolls are relaxed which exists for 24hrs minimum.
  • Fabric inspection in 4.0 pointsystem.
  • Shinkage, GSM, Colour fastness to washing will be tested  in our in-house lab facility.
  • CSV & lSV inspection done for shades.

CUTTING

 

  • Cutting planned with in-house CAD programing facility.
  • Lay length & lay heights are ensured with-in quality standards  & lay relaxation for 4 hours is followed.
  • After cutting, each and every panels are inspected by FML methods.
  • Stickering is done on all cut panels.
  • 100% Cut panels are inspected and loaded for sewing.

SEWING

  • Before sewing, PP meeting is conducted with all responsible merchandising, production & quality teams.
  • .Layout is planned for stylewise operation.
    Machine setting is done for each & every operation.
  • In-line production checking is done by 7.0 point system.In-line measurments are checked randomly  on all garments.

CHECKING

  • Clock wise checking is done on each garments.
  • 100% Final inspection is  done on all garments
  • After 100% Final inspection, random aql 1.0 inspection is conducted by our QC and passed to pressing.

IRONING & PACKING

  • Ironing & packing is done as per customer requirements followed by approved trim cards.
  • Pre-final is conducted once all packing is completed and offered to final inspection.